Thursday, January 22, 2009




We worked at a fairly fast clip with the tide starting to fall and the boat tied up to a concrete wall. As we got the engine in position we realized it was tighter than planned. The wrenches started working and parts began falling away and I remember saying "where did that just come from?" after about 1 hour we manged to get the engine down the hatch about the sametime the boat touched bottom, The problem is the enigine is in the salon we have to re rig it put the mounts back on and lower it into the engine room. we managed to move the boat off the wall about 4' and that gave us enough depth to hurry up and finish.




So from this to that:)
amazing what happens when you spend time and money